Projects


Keep track of projects shaping our neighborhood’s future!

From infrastructure improvements to new park developments and community studies, this section helps you stay informed about changes in our area. We provide updates on ongoing projects like road construction, park renovations, traffic studies, and other initiatives that impact our daily lives.

Each project listing includes current status, timeline, and ways to provide community input. Whether you’re curious about that new construction down the street or want to learn more about upcoming park improvements, you’ll find the latest project information here.

Infrastructure Projects

Name of ProjectBrief Description Target StartStatusEntity
(NHHIP) TxDOT 45 Realignment ProjectThe I-45 NHHIP Segment 3 encompasses the reconstruction of the downtown Houston freeway loop system, including I-45, I-69, I-10, and State Highway (SH) 288. In Segment 3, I-45 will be rerouted from the west side of downtown Houston to run parallel with I-69 and I-10 until it exits the downtown area and continues north2027ScheduledTxDOT
Reimagine Commerce St.Harris County Precinct 2, in partnership with the Harrisburg Redevelopment Authority (TIRZ 23) and the East Downtown Redevelopment Authority (TIRZ 15) is Reimagining Commerce Street to improve mobility, prioritize safety improvements, and integrate community input into the design alternatives.2026Pct 2
Telephone Rd. Revitalization ProjectThe Telephone Road: Main Street Revitalization Project matters because it reimagines and reinvests in a historic corridor that has long served as a cultural, commercial, and transportation backbone for Southeast Houston.2026ScheduledTIRZ 23
West Belt Improvement ProjectThe West Belt Railroad Grade Separation Project will make rail crossings safer and neighborhoods quieter while improving traffic flow through East Downtown and the Greater East End.2029DesignCity of Houston
Gulf Freeway Planning and Environmental Linkages (PEL) StudyExpanding I-45 South from I-69 to Beltway 8. Increasing number of lanes.PlanningTxDOT
McKinney Sidewalk ProjectReplacing side walks on north side of McKinney between Cullen and Dumble.April 2026ScheduledEED
Fourcade/Dumble Sidewalk ProjectReplacing sidewalks on Fourcade, across Telephone, up to LeelandDesignEED
Polk St. Sidewalk ProjectReplacing sidewalks from Baird to WaysideDesignTIRZ 23
East End RAILS StudyFeasibility Study for 14 at-grade crossings on the TriangleIn ProgressPct 2
Leeland/Cullen Grade Separation StudyTIRZ 24 is reviewing the feasibility if a Leeland/Cullen grade separation in conjunction with EHRA engineeringIn ProgressTIRZ 24
Western Gateways StudyA grant was awarded for traffic studies for Western Gateways into the Eastwood Area. This includes Leeland, Polk, McKinney, Jensen, Navigation, Emancipation. Also includes reviewing the feasability of opening up St Charles St Underpass for Bikes/PedsPlanningEED

Park Spaces & Trails Studies

Columbia Tap Trail Action Plan

Mason Park Master Plan

Eastwood Park Master Plan

Livable Centers and Mobility Improvement Studies

US 90A at Walmart – Pedestrian Study

Greater Eastwood Livable Centers Study

East End Walkability

Greater East End Bike Plan

Harris County Precinct 2 Projects Dashboard

Is there a project you want to learn more about? Send us an email at superneighborhood64and88@gmail.com.